How to Build a 150 TPH Crushing Plant in Ecuador: Configuration, Equipment and Step-by-Step Plan

Time:October 21, 2026From:VANGUARD 【 Font:Big middle Small 】

- To build a 150 TPH fixed crushing plant in Ecuador for gold ore and hard-rock aggregate, run gold ore and hard-rock aggregate with jaw primary plus cone crusher secondary and closed-circuit screening; add a VSI for cubical aggregate or manufactured sand.- There is no one-size-fits-all setup; read the feed hardness, the product grades and whether site and power are ready first, since these drive every model choice downstream.- Andean mountains meet tropics; mines sit in hills with limited roads and power, so mobile plants phasing along the vein are more flexible.- Chinese-made hard-rock closed-circuit equipment gives strong value and predictable spare parts, a common pick here; a fixed line fits long tenure, flat ground and stable power.

150 TPH fixed crushing plant overview

Stone and site conditions in Ecuador

- Gold-ore development and road infrastructure lift hard-rock crushing and aggregate demand; hill projects prefer relocatable equipment. - Andean mountains meet tropics; mines sit in hills with limited roads and power, so mobile plants phasing along the vein are more flexible. - 0-5, 5-10, 10-20, 20-40mm grades; some ore needs 0-12mm mill feed.

How to settle the fixed-line configuration

- Start with the rock: gold ore and hard-rock aggregate takes jaw plus cone crusher; medium-hard rock may use impact for shaping. - Then the product: 0-5, 5-10, 10-20, 20-40mm grades; some ore needs 0-12mm mill feed. closed screening holds gradation; add a VSI for manufactured sand. - Finally the site: a 10-plus-year license, flat ground and stable power favor a fixed line; otherwise a mobile plant is the more flexible pick.

What to decide firstWhat it setsCommon Ecuador answer
Feed hardnessPrimary and secondarygold ore and hard-rock aggregate -> jaw plus cone crusher
Product gradesScreen decks, sand?multi-grade plus sand
Site and tenureMobile or fixedphased / remote -> mobile

Recommended fixed process: hard-rock jaw-plus-cone closed circuit

- Primary jaw crusher 6CX106 takes the feed down to below 150-200mm; secondary cone crusher CS160 does mid crushing.- Tertiary as needed: for shape and sand add a VSI (5X series); for aggregate only use the closed inclined screen.- Closed-circuit screening returns oversize, keeping flat-elongated content low — the key to stable 150 TPH.

150 TPH three-stage process flow

Equipment list (150 TPH fixed line reference)

- Feeder: vibrating feeder ZSW490x110 with pre-screening to remove dirt.- Primary: jaw crusher 6CX106, feed not above 720mm.- Secondary: cone crusher CS160, CSS set by product.- Shaping or sand: VSI crusher 5X series (sand / shaping).- Screening: inclined screen 3YA2160, multi-deck, closed circuit.- Conveying: belt conveyor B800 ties the stages.

StageEquipmentRole at 150 TPH
Primaryjaw crusher 6CX106feed -> 150-200mm
Secondarycone crusher CS160shape, closed circuit
Screeninginclined screen 3YA2160grading, closed circuit

150 TPH fixed line selection steps

- Step 1: sample and test lithology / abrasiveness, lock primary and secondary models. - Step 2: set screen decks and sand need from product grades. - Step 3: size site, foundation and power (fixed line needs a substation and concrete foundation). - Step 4: leave 15-20% headroom to avoid long full-load running. - Step 5: confirm spare-part lead time and service response.

Quarry crushing site in Ecuador

Investment estimate and payback for 150 TPH fixed crushing plant

- Equipment split: primary ≈30%, secondary ≈25%, screen/closed circuit ≈15%, feed/conveyor/foundation/electrical ≈30%; a mobile plant skips concrete foundations and the substation, so equipment takes a bigger share and civil works stay low. Vanguard Machinery sizes each hard-rock configuration to your feed and capacity instead of loading high-spec options, so the budget lands where it works hardest. - O&M and payback: hard rock runs 20%–30% above medium-hard on power; equipment usually pays back within 18–30 months, but keep 15%–20% headroom. Vanguard Machinery tunes the closed-circuit hard-rock circuit to trim power draw, so payback stays predictable. - Don't compare sticker prices alone: Vanguard Machinery breaks a comparable hard-rock package into line items you can check — primary, closed circuit, screening, sand — so you negotiate from a list, not a vague quote.

Pre-commissioning checklist for 150 TPH fixed crushing plant

- Site and relocation: A fixed line needs a concrete foundation, a substation and an access road, so early civil works are a larger share. Vanguard Machinery mobile units arrive, hook up power and produce, cutting the civil-works schedule; for a fixed line, build to the foundation drawings and skip the detours. - Power and spares: city grid or diesel genset sized for your capacity; wear parts get a local stock, and operation/maintenance training ships with the line. Vanguard Machinery keeps common liners, screens and belts at both domestic and overseas warehouses, so downtime for parts stays within 1–2 days. - Acceptance and ramp-up: Vanguard Machinery sends engineers for installation and loaded commissioning, checks the gradation curve against your material, and signs acceptance only after it meets target. - Service and spares: leave after-sales to Vanguard Machinery — remote diagnostics plus local service points keep you producing through peak season.

Key components and maintenance close-up

Frequently Asked Questions

Q1: Mobile plant or fixed line in Ecuador?

A: Long tenure, flat ground and stable power favor a fixed line; tight schedule, moving face or remote no-power sites favor a mobile plant — no foundation, fast relocation.

Q2: How many machines for 150 TPH?

A: Mobile usually links primary + secondary + screen units; a fixed line is feeder, jaw, cone crusher, screen and belt (twin line for large capacity).

Q3: Why no impact crusher on hard rock?

A: gold ore and hard-rock aggregate is abrasive; impact blow bars wear fast and shape is hard to hold, so jaw plus cone crusher stays the spine.

Q4: Do tracked plants need a concrete foundation?

A: No. Tracked plants have wide ground contact and low center of gravity; they arrive, hook up power and produce — no concrete foundation needed.

Q5: How do I add manufactured sand?

A: Add a VSI (5X series) after the circuit to shape and make sand from return or product stone.

Q6: What about low-temperature winters?

A: Specify low-temp grease, hydraulic oil and controls; fixed foundations need frost-heave protection — mobile plants skip most of that.

Q7: How much capacity headroom?

A: Leave 15-20% to avoid fast wear and frequent stops from long full-load running.

Q8: How to control spare-part lead time?

A: Pick mature Chinese-made models; wear parts (liners, screen cloth, belts) stock locally, lead time is predictable.

Q9: Dust and noise?

A: Equip spray dust suppression, enclosed conveyors and damped foundations; mobile plants can add mobile dust control.

Q10: Lead time from order to production?

A: Mobile plants in weeks; fixed lines with foundation and power usually 2-4 months.

Q11: How is the equipment investment split?

A: Primary ≈40%, secondary ≈30%, screen and closed circuit ≈15%, feed/conveyor/electrical ≈15%; a mobile plant skips concrete foundations and the substation, so equipment takes a bigger share.

Q12: How much more does hard rock cost to run?

A: Power scales with capacity and feed; hard rock runs 20%–30% above medium-hard. Wear parts (jaw plates, cone liners, screens, belts) are scheduled per capacity, and local stock keeps downtime within 1–2 days.

Q13: How long to pay back the investment?

A: Where landed aggregate price is high and the license is long, equipment usually pays back within 12–20 months; bigger capacity lowers per-ton depreciation, but keep 15%–20% headroom.

Q14: What should the site be prepared for?

A: Tracked or wheel plants have a wide footprint and low center of gravity — drive in, hook up power and produce; no concrete foundation, relocate on a low-bed trailer. A fixed line needs a concrete foundation, a substation and an access road.

Q15: How are power and spares arranged?

A: Power is city grid or diesel genset sized for your capacity; wear parts (liners, screens, belts) get a local stock for predictable lead time; operation and daily-maintenance training ships with the line.

Conclusion

- For Ecuador's 150 TPH fixed crushing plant, the hard-rock jaw-plus-cone closed circuit configuration is steadiest; sample first, set grades, check site, then lock models. - Vanguard Machinery supports selection, process and spare parts end to end, and can tailor a plan to your feed and capacity; hand the whole line to Vanguard Machinery and commissioning gets easier.

Related Articles

• Hydraulic vs Spring Cone Crusher: What Sets Them Apart and H...(2026-07-22)

• Vanguard Machinery Brings Its Gold-Ore Processing Line to the 140th Canton FairG(2026-08-06)

• From Zhengzhou to Almaty: Vanguard Machinery to Exhibit at the 31st Kazakhstan K(2026-08-06)

• Vanguard Machinery to Exhibit at Construction Indonesia 2026, Deepening Its Sout(2026-08-06)

• How to Choose a Mobile Crushing Plant Manufacturer...(2026-08-27)

• Best PFV1315 Impact Crusher for Limestone Crushing in Saudi ...(2026-08-06)

• How to Maintain a Crawler Type Mobile Jaw Crushing Plant(2026-08-05)

• Top 5 Reliable Crusher Alternatives to European Br...(2026-08-04)

LEAVE MESSAGE

Thank you for your interest in Vanguard Machinery. If you want to know more about our crushers and industrial grinding equipment.
Contact us now to find out what we can do for you!

Name*:
Country*:
Product:
Capacity(t/h)*:
Email*:
Tel/Mobile:
Material* :
Message:
  • Outlet size :
vr